PowerBank's history is ugly and it operates just 35 MW of solar today, but its sites, permitting relationships, and a recent LOI open a real path into the AI buildout's bottleneck: power delivery
Trust floor at ~$10.25 caps the downside at ~4%. Upside depends on conversion of a $300M qualified pipeline across GPU cloud, modular data centers, and HVDC power
SPAC merger priced below every public GPU cloud peer, with a team that's built and sold this infrastructure before.